A route assessed beyond its top layer
Gradients affect run-off
We consider how water moves along and across sloping sections.
Treatments fit sound bases
Tar and chipping isn't used to disguise unstable construction.
Access points guide stages
We plan around entrances and the journeys that cannot be ignored.
Choose a finish after checking the route
Private roads and country lanes can appear simple until weak verges, steep sections and poor run-off start breaking the surface apart. We assess width, gradients, drainage and expected vehicle use before recommending the work. As tarmac contractors serving Sittingbourne, we handle full resurfacing and can consider tar and chipping for suitable stable routes. The existing construction makes the decision. Surface treatment may renew a sound base, while deep movement, depressions or failed edges can require repairs or more substantial rebuilding first.


Maintain essential access where the site allows
A private route may be the only way in for residents, deliveries and service vehicles. For work near Sittingbourne, we map entrances, passing points and areas where equipment can operate before arranging the sequence. Tarmac must be laid and cooled correctly, while tar and chipping needs application, rolling and an initial bedding-in period. Each method brings different temporary access limits. We explain those stages before starting so users know when sections must remain clear and where alternative arrangements may be needed.
Frequently asked questions
When might tar and chipping suit a private route?
It can suit some stable, prepared roads where the intended traffic and desired textured finish fit the method. We first check for base movement, drainage failure and weak edges that would need attention before treatment.
Does full resurfacing fix deep depressions automatically?
Not unless the cause is prepared properly. Depressions can indicate failed supporting layers or water damage. We assess and correct unsuitable areas before laying the new finish, rather than relying on the top layer to bridge movement.
How should route users prepare for the work?
Vehicles may need moving away from planned sections, and deliveries may need timing around temporary restrictions. We discuss access points and essential journeys in advance. Freshly laid or treated areas must remain clear during key stages.